Offshoretronic Releases a New Offshore Installation Vessel Design
The company states that the new designed Offshore Installation Vessel and new Installation Method will have up to 40% faster installation time compared to the older & traditional Jackup Wind Turbine Installation Vessels.
By implementing smart innovations and usage of Autonomous Dual Crane operations and integrated fast Ballast systems Offshoretronic believes they can safe up to 10-15 operational time compare to the Monohull vessel presently coming on the market.
The SUSTAINABLE INSTALLER I & II Vessels will be able to perform the installation of all types of Offshore Wind Foundations and Turbine Parts and carry all the required tools on-board the Vessels.
The Vessels are an excellent platform for Oil & Gas Construction and Decommissioning work and can easily deployed world wide. The Vessels will have a larger Main Deck and Lifting capacity than any other competitor within the Offshore Wind and Oil & Gas De-commissioning MID-segments.
Designed to meet the new demand:
- The unique Vessel is entirely designed and outfitted to Lift and Transport the next generation Wind foundations:
- Large size XL and XXL Mono Pile foundations up to 120 m long and max. 12 m diameter and weights up to 3000 mt
- Large size jackets or tripod foundations up to 2500 mt – 80 m high and with 40m footprint.
- De-commissioning and removal of MID-size platforms and subsea structures in tandem lifting mode up to 4500 mt.