Load Out and Installation of the New Tie-in Subsea Spool for Duva Project
The Duva development project is progressing!
Have a look at this video showing the load out and installation of the new tie-in subsea spool. The spool weighs 64 tonnes and stretches 50 metres, allowing production of the Duva field through the existing infrastructure on Gjøa.
Neptune Energy is the proud operator of both fields in the Norwegian North Sea.
Neptune Energy: “Thanks to partners and contractors for a successful production and installation!”